Measure Title: |
RELATING TO CONSTRUCTION WASTE.
|
Report Title: |
Recycling; Construction Waste; Priority Offeror Selections
|
Description: |
Requires recycling of construction and demolition materials and use of recycled materials to factor into priority offeror selections for competitive procurements of construction or demolition services by the State or any county.
|
Companion: |
HB2101
|
Package: |
None
|
Current Referral: |
GVO/AEN, CPN/WAM
|
Introducer(s): |
SHIMABUKURO, CHANG, Kidani, San Buenaventura
|
Act: |
|
Sort by Date | | Status Text |
2/13/2024 | S | The committee on GVO deferred the measure. |
2/13/2024 | S | The committee on AEN deferred the measure. |
2/6/2024 | S | The committee(s) on GVO/AEN has scheduled a public hearing on 02-13-24 3:00PM; Conference Room 225 & Videoconference. |
1/22/2024 | S | Referred to GVO/AEN, CPN/WAM. |
1/22/2024 | S | Passed First Reading. |
1/19/2024 | S | Introduced. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
SB2436