Measure Title: RELATING TO ELECTRIC VEHICLE INFRASTRUCTURE.
Report Title: Zero-emission Transportation Goals; Electric Vehicle Infrastructure; Special Management Areas; Exclusion
Description: Excludes from the definition of "development", as it applies to special management areas, the construction, installation, maintenance, repair, and replacement of an electric vehicle charging system as a minor structure. Includes the Public Utilities Commission in the development and implementation of plans to meet the long-term goals for zero-emissions transportation in the State.
Companion:  HB1619
Package: None
Current Referral: EIG/WLA, CPN
Introducer(s): WAKAI, KIDANI, LEE, C., SAN BUENAVENTURA, Chang, Hashimoto
Act:

Sort by DateChamberStatus Text
2/13/2026SThe committee(s) on EIG/WLA has scheduled a public hearing on 02-17-26 3:03PM; Conference Room 224 & Videoconference.
1/28/2026SReferred to EIG/WLA, CPN.
1/22/2026SPassed First Reading.
1/22/2026SIntroduced.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


SB2434

All Versions of this Measure

Committee Reports

No other committee reports available at this time. You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.

Testimony

No testimony available at this time.

Hearing Notices

EIG/WLA
2/17/26 3:03P
CR 224 & Videoconference