Measure Title: RELATING TO ELECTRIC VEHICLE CHARGING INFRASTRUCTURE.
Report Title: Electric Vehicle Charging Infrastructure; Electric Vehicle-ready Parking Stalls; Affordable Housing; Rebates; HHFDC
Description: Provides rebates for the installation of eligible electric vehicle-ready parking stalls for new construction of affordable housing.
Companion:  HB346
Package: None
Current Referral: EIG/TCA, WAM
Introducer(s): LEE, C., HASHIMOTO, RHOADS, Richards
Act:

Sort by DateChamberStatus Text
2/14/2025SReport adopted; Passed Second Reading and referred to WAM.
2/14/2025SReported from EIG/TCA (Stand. Com. Rep. No. 540) with recommendation of passage on Second Reading and referral to WAM.
2/11/2025SThe committee(s) on TCA recommend(s) that the measure be PASSED, UNAMENDED. The votes in TCA were as follows: 4 Aye(s): Senator(s) Lee, C., Elefante, Kanuha, DeCorte; Aye(s) with reservations: none ; 0 No(es): none; and 1 Excused: Senator(s) Inouye.
2/11/2025SThe committee(s) on EIG recommend(s) that the measure be PASSED, UNAMENDED. The votes in EIG were as follows: 4 Aye(s): Senator(s) Wakai, Chang, DeCoite, Richards; Aye(s) with reservations: none ; 0 No(es): none; and 1 Excused: Senator(s) Fevella.
2/5/2025SThe committee(s) on EIG/TCA has scheduled a public hearing on 02-11-25 3:00PM; Conference Room 224 & Videoconference.
1/23/2025SReferred to EIG/TCA, WAM.
1/21/2025SPassed First Reading.
1/17/2025SIntroduced.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


SB1088

All Versions of this Measure

Committee Reports

Hearing Notices

EIG/TCA
2/11/25 3:00P
CR 224 & Videoconference