RELATING TO HIGH-VOLTAGE ELECTRIC TRANSMISSION LINES.
|
Report Title: |
PUC; OPSD; Public Utilities; High-Voltage Electric Transmission Lines; Overhead Construction; Undergrounding
|
Description: |
Prohibits the construction of overhead high-voltage electric transmission lines. Requires the Office of Planning and Sustainable Development to submit to the Public Utilities Commission a report identifying the areas of the State having the highest risk of wildfires. Requires the Public Utilities Commission to direct certain public utilities to underground all existing overhead high-voltage electric transmission lines.
|
Companion: |
|
Package: |
None
|
Current Referral: |
EEP/WAL, CPC, FIN
|
Introducer(s): |
COCHRAN, AMATO, KAPELA, MARTEN, PERRUSO
|
Act: |
|
Sort by Date | | Status Text |
1/29/2024 | H | Re-referred to EEP/WAL, CPC, FIN, referral sheet 5 |
1/24/2024 | H | Referred to WAL, CPC, FIN, referral sheet 2 |
1/22/2024 | H | Introduced and Pass First Reading. |
1/19/2024 | H | Pending introduction. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
HB2169
No other committee reports available at this time.
You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
No testimony available at this time.