2021 Archives
You are viewing archived information from 2021
Measure Title: |
RELATING TO PROCUREMENT.
|
Report Title: |
Procurement; Subcontractor Listing; Competitive Sealed Bidding; Public Works Construction Project; Bid Shopping; Bid Peddling
|
Description: |
Allows a bidder of a public works construction project to clarify and correct certain information regarding subcontractors for up to two hours after bid closing. Mandates a two hour waiting period after bid closing before construction bids can be opened. Prohibits bid shopping and bid peddling for the competitive sealed bidding process. Requires public procurement construction bids to list subcontractors and joint contractors only for contracts with an unspecified total value; provided that bids lacking this list may be accepted if in the State's best interest and the value of the work to be performed by the joint contractor or subcontractor is equal to or less than an unspecified percent of the total bid amount. Repeals 7/1/2023.
|
Companion: |
|
Package: |
None
|
Current Referral: |
GVR, CPC, FIN
|
Introducer(s): |
MCKELVEY, TARNAS, WILDBERGER
|
Act: |
|
Sort by Date | | Status Text |
2/5/2021 | H | The committee(s) on GVR recommend(s) that the measure be deferred. |
2/2/2021 | H | Bill scheduled to be heard by GVR on Friday, 02-05-21 9:00AM in House conference room Via Videoconference. |
2/1/2021 | H | Referred to GVR, CPC, FIN, referral sheet 3 |
1/27/2021 | H | Introduced and Pass First Reading. |
1/26/2021 | H | Pending introduction. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
HB1214
No other committee reports available at this time.
You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
GVR
2/05/21 9:00A
Via Videoconference