Measure Title: RELATING TO ENERGY.
Report Title: Environmental Impact Assessments; Power-Generating Facilities; Combustion; Electricity
Description: Clarifies the definition of "power-generating facility" for the purposes of environmental impact assessments to include new combustion electricity-generating facilities operating beginning January 1, 2024, that were not previously operational. Includes power-generating facilities that are converting from one source of energy to another source, where the new source requires combustion and the electrical output rating of the converted facility exceeds 5.0 megawatts.
Companion:  HB2097HB2798
Package: None
Current Referral: EET, CPN
Introducer(s): GABBARD, KIDANI, Fevella
Act:

Sort by Date Status Text
1/22/2024SReferred to EET, CPN.
1/19/2024SPassed First Reading.
1/19/2024SIntroduced.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


SB2367
All Versions of this Measure
Committee Reports
No other committee reports available at this time. You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
Testimony
No testimony available at this time.
Hearing Notices
No hearings scheduled