Measure Title: |
RELATING TO ENERGY.
|
Report Title: |
Environmental Impact Assessments; Power-Generating Facilities; Combustion; Electricity
|
Description: |
Clarifies the definition of "power-generating facility" for the purposes of environmental impact assessments to include new combustion electricity-generating facilities operating beginning January 1, 2024, that were not previously operational. Includes power-generating facilities that are converting from one source of energy to another source, where the new source requires combustion and the electrical output rating of the converted facility exceeds 5.0 megawatts.
|
Companion: |
HB2097, HB2798
|
Package: |
None
|
Current Referral: |
EET, CPN
|
Introducer(s): |
GABBARD, KIDANI, Fevella
|
Act: |
|
Sort by Date | | Status Text |
1/22/2024 | S | Referred to EET, CPN. |
1/19/2024 | S | Passed First Reading. |
1/19/2024 | S | Introduced. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
SB2367