Measure Title: |
RELATING TO ELECTRIC VEHICLE CHARGING INFRASTRUCTURE.
|
Report Title: |
HSEO; DOT; DAGS; Electric Vehicle Charging Infrastructure; State Buildings; Retrofitting; Appropriation ($)
|
Description: |
Requires the design of all new state building construction where parking is to be included to provide that at least twenty-five per cent of parking stalls be electric vehicle charger-ready. Requires the Hawaii State Energy Office, in consultation with the Department of Accounting and General Services and Department of Transportation, to conduct a survey and identify certain high-priority state facilities. Establishes a goal of the State to retrofit state facilities to be electric vehicle charger-ready. Requires a report to the Legislature. Appropriates funds.
|
Companion: |
HB344
|
Package: |
None
|
Current Referral: |
GVO/EIG, WAM
|
Introducer(s): |
LEE, C., HASHIMOTO, MCKELVEY, RHOADS, Richards
|
Act: |
|
Sort by Date | | Status Text |
1/23/2025 | S | Referred to GVO/EIG, WAM. |
1/21/2025 | S | Passed First Reading. |
1/17/2025 | S | Introduced. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
SB1089