2024 Archives
You are viewing archived information from 2024
Measure Title: |
RELATING TO PUBLIC UTILITIES.
|
Report Title: |
Wildfires; Deenergizing Electrical Lines; Notification; Telecommunications; Electric Utilities; Mitigation Plan
|
Description: |
Requires all telecommunications service providers to communicate relevant information relating to the deenergization of electrical lines to public safety or emergency response offices for the affected areas. Requires all electric utility companies to operate electrical lines and equipment in a manner that shall minimize the risk of catastrophic wildfire posed by the electrical lines and equipment. Requires each electric utility company to prepare a wildfire mitigation plan and protocols for deenergizing electrical lines.
|
Companion: |
SB2091
|
Package: |
None
|
Current Referral: |
EEP/WAL, CPC
|
Introducer(s): |
NAKASHIMA
|
Act: |
|
Sort by Date | | Status Text |
1/29/2024 | H | Re-referred to EEP/WAL, CPC, referral sheet 4 |
1/24/2024 | H | Referred to WAL/EEP, CPC, referral sheet 1 |
1/18/2024 | H | Introduced and Pass First Reading. |
1/17/2024 | H | Pending introduction. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
HB1679
No other committee reports available at this time.
You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
No testimony available at this time.