Measure Title: RELATING TO PROCUREMENT.
Report Title: Procurement; Bid Submissions; Immaterial or Technical Information
Description: Allows bidders to clarify or correct immaterial or technical information required as part of a bid submission for up to twenty-four hours after the bid submission deadline. Requires that bids for construction be opened no sooner than twenty-four hours after the deadline for the submission of bids. Defines "immaterial or technical information". Repeals 6/30/2027.
Companion:
Package: None
Current Referral: CPC, FIN
Introducer(s): MATAYOSHI, CHUN, KAHALOA, KEOHOKAPU-LEE LOY, LA CHICA, LEE, M., MARTEN, TARNAS
Act:

Sort by DateChamberStatus Text
2/4/2025HThe committee(s) on CPC recommend(s) that the measure be deferred.
1/31/2025HBill scheduled to be heard by CPC on Tuesday, 02-04-25 2:00PM in House conference room 329 VIA VIDEOCONFERENCE.
1/21/2025HReferred to CPC, FIN, referral sheet 2
1/21/2025HIntroduced and Pass First Reading.
1/17/2025HPending introduction.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


HB809

All Versions of this Measure

Committee Reports

No other committee reports available at this time. You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.

Hearing Notices

CPC
2/04/25 2:00P
329 VIA VIDEOCONFERENCE