Measure Title: RELATING TO THE PROCUREMENT CODE.
Report Title: Procurement Code; Construction; Insurance; Construction Defects
Description: Requires public contractors to obtain insurance to cover at least half of a project's construction costs to the State to provide funds for curing construction defects discovered within ten years after the completion of the contract. Authorizes the State to institute an action against the contractor for the total costs of curing those defects.
Companion:
Package: None
Current Referral: CPC, FIN
Introducer(s): MATAYOSHI, CHUN, KEOHOKAPU-LEE LOY, LEE, M., MARTEN, TAKAYAMA, TAM, TARNAS
Act:

Sort by DateChamberStatus Text
2/4/2025HThe committee(s) on CPC recommend(s) that the measure be deferred.
1/31/2025HBill scheduled to be heard by CPC on Tuesday, 02-04-25 2:00PM in House conference room 329 VIA VIDEOCONFERENCE.
1/21/2025HReferred to CPC, FIN, referral sheet 2
1/21/2025HIntroduced and Pass First Reading.
1/17/2025HPending introduction.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


HB808

All Versions of this Measure

Committee Reports

No other committee reports available at this time. You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.

Hearing Notices

CPC
2/04/25 2:00P
329 VIA VIDEOCONFERENCE