Measure Title: RELATING TO RENEWABLE ENERGY.
Report Title: PUC; Renewable Energy; Customer-sited Distributed Energy Resources; Installation Goal
Description: Establishes an installation goal for customer-sited distributed energy resources in the State. Ensures that fair compensation is provided to distributed energy resources exports as part of grid service programs. Effective 7/1/3000. (HD1)
Companion:  SB589
Package: None
Current Referral: EEP, CPC, FIN
Introducer(s): LOWEN, AMATO, GRANDINETTI, KAPELA, KITAGAWA, MARTEN, PERRUSO, QUINLAN, TAM, TARNAS, TODD
Act:

Sort by DateChamberStatus Text
2/6/2025HPassed Second Reading as amended in HD 1 and referred to the committee(s) on CPC with none voting aye with reservations; Representative(s) Garcia, Pierick voting no (2) and Representative(s) Ward excused (1).
2/6/2025HReported from EEP (Stand. Com. Rep. No. 224) as amended in HD 1, recommending passage on Second Reading and referral to CPC.
2/4/2025HThe committee on EEP recommend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 5 Ayes: Representative(s) Lowen, Perruso, Kahaloa, Kusch, Quinlan; Ayes with reservations: none; Noes: none; and 1 Excused: Representative(s) Ward.
1/28/2025HBill scheduled to be heard by EEP on Tuesday, 02-04-25 9:00AM in House conference room 325 VIA VIDEOCONFERENCE.
1/21/2025HReferred to EEP, CPC, FIN, referral sheet 2
1/21/2025HIntroduced and Pass First Reading.
1/17/2025HPending introduction.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


HB790 HD1

All Versions of this Measure

Committee Reports

Hearing Notices

EEP
2/04/25 9:00A
325 VIA VIDEOCONFERENCE