Measure Title: RELATING TO PROCUREMENT CONTRACTS.
Report Title: Procurement; Contract; Performance Incentive Contracts
Description: Requires all performance incentive contracts to specify a pricing basis, performance goals, and a formula in calculating the contractor's profit, fees, or price decrease if the specified performance goals are exceeded or not met. Effective 1/1/2525. (SD1)
Companion:
Package: None
Current Referral: GVO, WAM
Introducer(s): AQUINO, CHANG, FEVELLA, GABBARD, HASHIMOTO, Richards
Act:

Sort by DateChamberStatus Text
2/10/2025SReport adopted; Passed Second Reading, as amended (SD 1) and referred to WAM.
2/10/2025SReported from GVO (Stand. Com. Rep. No. 190) with recommendation of passage on Second Reading, as amended (SD 1) and referral to WAM.
1/30/2025SThe committee(s) on GVO recommend(s) that the measure be PASSED, WITH AMENDMENTS. The votes in GVO were as follows: 4 Aye(s): Senator(s) McKelvey, Gabbard, Moriwaki, San Buenaventura; Aye(s) with reservations: none ; 0 No(es): none; and 1 Excused: Senator(s) Fevella.
1/28/2025SThe committee(s) on GVO deferred the measure until 01-30-25 3:01PM; Conference Room 225.
1/24/2025SThe committee(s) on GVO has scheduled a public hearing on 01-28-25 3:00PM; Conference Room 225 & Videoconference.
1/21/2025SReferred to GVO, WAM.
1/16/2025SPassed First Reading.
1/16/2025SIntroduced.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


SB462 SD1

All Versions of this Measure

Committee Reports

Hearing Notices

GVO
1/28/25 3:00P
CR 225 & Videoconference
GVO
1/30/25 3:01P
CR 225