Measure Title: |
RELATING TO RENEWABLE ENERGY.
|
Report Title: |
Grid-ready Homes Interconnection Process; Renewable Energy; Public Utilities Commission; Electricity Reliability Administrator; Electricity Reliability Surcharge
|
Description: |
Requires the Public Utilities Commission to establish a streamlined grid-ready homes interconnection process. Authorizes the use of the Hawaii electricity reliability surcharge for cost recovery of certain expenses of the Hawaii electricity reliability administrator associated with the grid-ready homes interconnection process. Requires report to the Legislature on the grid-ready homes interconnection process.
|
Companion: |
SB587
|
Package: |
None
|
Current Referral: |
EEP, CPC, FIN
|
Introducer(s): |
LOWEN
|
Act: |
|
Sort by Date | Chamber | Status Text |
1/28/2025 | H | The committee(s) on EEP recommend(s) that the measure be deferred. |
1/24/2025 | H | Bill scheduled to be heard by EEP on Tuesday, 01-28-25 9:00AM in House conference room 325 VIA VIDEOCONFERENCE. |
1/21/2025 | H | Referred to EEP, CPC, FIN, referral sheet 1 |
1/17/2025 | H | Introduced and Pass First Reading. |
1/16/2025 | H | Pending introduction. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
HB340