Measure Title: RELATING TO RENEWABLE ENERGY.
Report Title: Grid-ready Homes Interconnection Process; Renewable Energy; Public Utilities Commission; Electricity Reliability Administrator; Electricity Reliability Surcharge
Description: Requires the Public Utilities Commission to establish a streamlined grid-ready homes interconnection process. Authorizes the use of the Hawaii electricity reliability surcharge for cost recovery of certain expenses of the Hawaii electricity reliability administrator associated with the grid-ready homes interconnection process. Requires report to the Legislature on the grid-ready homes interconnection process.
Companion:  SB587
Package: None
Current Referral: EEP, CPC, FIN
Introducer(s): LOWEN
Act:

Sort by DateChamberStatus Text
1/28/2025HThe committee(s) on EEP recommend(s) that the measure be deferred.
1/24/2025HBill scheduled to be heard by EEP on Tuesday, 01-28-25 9:00AM in House conference room 325 VIA VIDEOCONFERENCE.
1/21/2025HReferred to EEP, CPC, FIN, referral sheet 1
1/17/2025HIntroduced and Pass First Reading.
1/16/2025HPending introduction.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


HB340

All Versions of this Measure

Committee Reports

No other committee reports available at this time. You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.

Hearing Notices

EEP
1/28/25 9:00A
325 VIA VIDEOCONFERENCE