Measure Title: RELATING TO THE CONTRACTOR REPAIR ACT.
Report Title: Contractor Repair Act; Notice of Claim; Inspection; Repair; Rejection of Claims; Limitations on Recovery
Description: Expands the required contents of a notice of claim of construction defect served on a contractor. Requires the claimant to provide actual evidence of the nature and cause of the construction defect and extent of necessary repairs along with the notice of claim. Amends the process and timeframe for a claimant to accept a contractor's proposal to inspect and authorize the contractor to proceed with repairs. Limits the amount a claimant can recover if the claimant unreasonably rejects a contractor's proposal to inspect or an offer to remedy.
Companion:  HB2213
Package: None
Current Referral: CPN, JDC
Introducer(s): HASHIMOTO
Act:

Sort by Date Status Text
1/29/2024SReferred to CPN, JDC.
1/26/2024SPassed First Reading.
1/24/2024SIntroduced.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


SB3334
All Versions of this Measure
Committee Reports
No other committee reports available at this time. You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
Testimony
No testimony available at this time.
Hearing Notices
No hearings scheduled