Measure Title: RELATING TO THE CONTRACTOR REPAIR ACT.
Report Title: Contractor Repair Act; Notice of Claim; Inspection; Repair; Rejection of Claims; Limitations on Recovery
Description: Expands the required contents of a notice of claim of construction defect served on a contractor. Requires the claimant to provide actual evidence of the nature and cause of the construction defect and extent of necessary repairs along with the notice of claim to the extent the claimant has evidence. Amends the process and time frame for a claimant to accept a contractor's proposal to inspect and authorize the contractor to proceed with repairs. Limits the amount a claimant can recover if the claimant unreasonably rejects a contractor's proposal to inspect or an offer to remedy.
Companion:
Package: None
Current Referral: CPN, JDC
Introducer(s): CHANG
Act:

Sort by DateChamberStatus Text
1/21/2025SReferred to CPN, JDC.
1/15/2025SIntroduced and passed First Reading.
1/14/2025SPending Introduction.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


SB331

All Versions of this Measure

Committee Reports

No other committee reports available at this time. You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.

Testimony

No testimony available at this time.

Hearing Notices

No hearings scheduled