Measure Title: RELATING TO STATE BUILDINGS.
Report Title: Hurricane Preparedness; Category 5; State Buildings; Shelters
Description: Requires certain state buildings intended for use as emergency shelters and constructed on or after July 1, 2027, be designed to withstand Category 5 hurricanes.
Companion:
Package: None
Current Referral: GVO/PSM, WAM
Introducer(s): GABBARD
Act:

Sort by DateChamberStatus Text
2/13/2026SThe committee(s) on GVO/PSM has scheduled a public hearing on 02-17-26 3:30PM; CR 225 & Videoconference.
1/30/2026SReferred to GVO/PSM, WAM.
1/26/2026SPassed First Reading.
1/23/2026SIntroduced.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


SB2882

All Versions of this Measure

Committee Reports

No other committee reports available at this time. You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.

Testimony

No testimony available at this time.

Hearing Notices

GVO/PSM
2/17/26 3:30P
CR 225 & Videoconference