Measure Title: RELATING TO ENERGY.
Report Title: Environmental Impact Assessments; Power-generating Facilities; Combustion; Electricity
Description: Amends the types of proposed power-generating facilities that trigger an environmental assessment to include new combustion electricity-generating facilities operating commercially after 1/1/2024 that were not previously operational and certain expansions in generating capacity of existing combustion electricity-generating facilities. Effective 7/1/3000. (HD1)
Companion:  SB2367
Package: None
Current Referral: EEP, CPC
Introducer(s): SAIKI (Introduced by request of another party)
Act:

Sort by Date Status Text
2/14/2024HPassed Second Reading as amended in HD 1 and referred to the committee(s) on CPC with none voting aye with reservations; none voting no (0) and Representative(s) Matayoshi, Takayama, Todd excused (3).
2/14/2024HReported from EEP (Stand. Com. Rep. No. 387-24) as amended in HD 1, recommending passage on Second Reading and referral to CPC.
2/1/2024HThe committee on EEP recommend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 5 Ayes: Representative(s) Lowen, Cochran, Gates, Kahaloa, Perruso; Ayes with reservations: none; Noes: none; and 2 Excused: Representative(s) Woodson, Ward.
1/29/2024HBill scheduled to be heard by EEP on Thursday, 02-01-24 9:30AM in House conference room 325 VIA VIDEOCONFERENCE.
1/26/2024HReferred to EEP, CPC, referral sheet 3
1/24/2024HIntroduced and Pass First Reading.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


HB2798 HD1
All Versions of this Measure
Committee Reports
Hearing Notices
EEP
2/01/24 9:30A
325 VIA VIDEOCONFERENCE