Hawaii State Seal

Hawai'i State Legislature

Ka 'Aha'ōlelo Moku'āina 'O Hawai'i

Full Video Stream

Start of measure content
Measure details
Measure Title: REQUESTING THE PUBLIC UTILITIES COMMISSION TO PROVIDE A WRITTEN STATUS UPDATE ON THE IMPLEMENTATION OF THE HAWAII ELECTRIC RELIABILITY ADMINISTRATOR.
Report Title: HERA; PUC; Electric Grid; Reports; Energy
Description:
Companion:  HR193SCR96
Package: None
Current Referral: EEP, CPC
Introducer(s): LOWEN, KUSCH, PERRUSO
Act:

Measure Status History

Sort by Date
DateChamberStatus Text
4/2/2026HResolution scheduled to be heard by CPC on Tuesday, 04-07-26 2:00PM in conference room 329 VIA VIDEOCONFERENCE.
4/1/2026HReport adopted; referred to the committee(s) on CPC as amended in HD 1 with none voting aye with reservations; none voting no (0) and none excused (0).
4/1/2026HReported from EEP (Stand. Com. Rep. No. 1613-26) as amended in HD 1, recommending referral to CPC.
3/24/2026HThe committee on EEP recommend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 5 Ayes: Representative(s) Lowen, Perruso, Chun, Kusch, Matsumoto; Ayes with reservations: none; Noes: none; and 2 Excused: Representative(s) Kahaloa, Quinlan.
3/20/2026HResolution scheduled to be heard by EEP on Tuesday, 03-24-26 9:00AM in conference room 325 VIA VIDEOCONFERENCE.
3/18/2026HReferred to EEP, CPC, referral sheet 19
3/16/2026HOffered

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


All Versions of this Measure

Committee Reports

Hearing Notices

EEP
3/24/26 9:00A
325 VIA VIDEOCONFERENCE
CPC
4/07/26 2:00P
329 VIA VIDEOCONFERENCE