Measure Title: REQUESTING THE PUBLIC UTILITIES COMMISSION TO ORDER HAWAIIAN ELECTRIC TO CONTINUE TO DEPLOY AND PURSUE COMMUNITY-BASED RENEWABLE ENERGY PROJECTS.
Report Title: Community-based Renewable Energy Projects; Hawaiian Electric
Description:
Companion:  HCR120
Package: None
Current Referral: EEP, CPC
Introducer(s): LOWEN
Act:

Sort by Date Status Text
3/22/2024HReport adopted; referred to the committee(s) on CPC with none voting aye with reservations; Representative(s) Garcia voting no (1) and Representative(s) Evslin, Garrett, Kila, Lamosao, Martinez, Nakashima, Quinlan excused (7).
3/22/2024HReported from EEP (Stand. Com. Rep. No. 1344-24), recommending referral to CPC.
3/21/2024HThe committee on EEP recommend that the measure be PASSED, UNAMENDED. The votes were as follows: 4 Ayes: Representative(s) Lowen, Cochran, Perruso, Woodson; Ayes with reservations: none; Noes: none; and 3 Excused: Representative(s) Gates, Kahaloa, Ward.
3/15/2024HResolution scheduled to be heard by EEP on Thursday, 03-21-24 9:31AM in conference room 325 VIA VIDEOCONFERENCE.
3/13/2024HReferred to EEP, CPC, referral sheet 21
3/8/2024HOffered
3/7/2024HTo be offered.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


HR101
All Versions of this Measure
Committee Reports
Hearing Notices
EEP
3/21/24 9:31A
325 VIA VIDEOCONFERENCE