2021 Archives
You are viewing archived information from 2021
HB560 HD1    Pdf File  
Measure Title: RELATING TO RENEWABLE ENERGY.
Report Title: Renewable Energy; Public Utilities Commission; Electric Public Utilities; Interconnection Process
Description: Requires timely completion of the interconnection process by electric public utilities. Effective 7/1/2050. (HD1)
Companion:  SB929
Package: None
Current Referral: EEP, CPC, FIN
Introducer(s): LOWEN (Introduced by request of another party)
Act:

Sort by Date Status Text
2/4/2021HPassed Second Reading as amended in HD 1 and referred to the committee(s) on CPC with Representative(s) Okimoto voting aye with reservations; none voting no (0) and Representative(s) Tokioka excused (1).
2/4/2021HReported from EEP (Stand. Com. Rep. No. 11) as amended in HD 1, recommending passage on Second Reading and referral to CPC.
2/2/2021HThe committees on EEP recommend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 7 Ayes: Representative(s) Lowen, Marten, Hashem, Matayoshi, Perruso, Todd, Matsumoto; Ayes with reservations: none; 0 Noes: none; and 1 Excused: Representative(s) Tokioka.
1/29/2021HBill scheduled to be heard by EEP on Tuesday, 02-02-21 8:30AM in House conference room Via Videoconference.
1/27/2021HReferred to EEP, CPC, FIN, referral sheet 1
1/25/2021HIntroduced and Pass First Reading.
1/22/2021HPending introduction.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


HB560 HD1
All Versions of this Measure

Committee Reports


Hearing Notices
EEP
2/02/21 8:30A
Via Videoconference