2020 Archives
You are viewing archived information from 2020
Measure Title: |
RELATING TO AN UNDERWATER TUNNEL AND SUPPORTING ROADWAYS TO PROVIDE A MORE DIRECT CONNECTION BETWEEN EWA AND DOWNTOWN HONOLULU.
|
Report Title: |
DOT; Pearl Harbor Tunnel; Feasibility Study; Private-Public Partnership; Bond; Appropriation ($)
|
Description: |
Requires the Department of Transportation to conduct a study on the feasibility of a private-public partnership to design, build, and operate an underwater tunnel for vehicle traffic to provide a more direct connection between Ewa and downtown Honolulu along with the expansion of roadways as necessary to maximize use of the tunnel. Authorizes general obligation bonds. Appropriates funds.
|
Companion: |
HB1950
|
Package: |
None
|
Current Referral: |
TRS, WAM
|
Introducer(s): |
FEVELLA, K. RHOADS, Gabbard, Kim, Moriwaki
|
Act: |
|
Sort by Date | | Status Text |
1/27/2020 | S | Referred to TRS, WAM. |
1/23/2020 | S | Passed First Reading. |
1/23/2020 | S | Introduced. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
SB3027
No other committee reports available at this time.
You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
No testimony available at this time.