THE SENATE |
S.B. NO. |
66 |
THIRTY-THIRD LEGISLATURE, 2025 |
S.D. 2 |
|
STATE OF HAWAII |
H.D. 3 |
|
|
C.D. 1 |
|
|
||
|
A BILL FOR AN ACT
RELATING TO HOUSING.
BE IT
ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
The legislature further finds that some of the largest obstacles for developers to construct more housing in the State are:
(1) A lack of areas with proper zoning to allow for the construction of residential dwellings;
(2) A lack of infrastructure to support newly developed residential dwellings; and
(3) Delays in the issuance of building permits for single‑family and multi-family projects.
The building permit processing times for single-family and multi-family projects vary tremendously across the United States. However, the counties in Hawaii have some of the longest processing times for residential building permits. An April 2022 study prepared by the university of Hawaii economic research organization found that, on average, Hawaii homebuilders wait three times longer for permits than those in other states, which drives up costs significantly and creates uncertainty, serving as a disincentive to build new projects. Furthermore, the study found that compared to the most regulated markets in the country, Hawaii's permit delays are almost two times longer, meaning it can take from one year to one and a half years for a permit to be approved.
The legislature also finds that lengthy processing times to obtain a building permit raises questions about what information is necessary for counties when processing building permit applications. The basic responsibilities of the counties are to ensure compliance with various building codes and ensure adequate infrastructure capacity to support the proposed project or development. Although it is the counties' responsibility to monitor for compliance with various building codes, if the construction plans do not satisfy these codes and are not corrected before construction, the designer, who is a licensed professional who stamped the plans, and the contractor are ultimately responsible. The counties are also not typically involved in litigation as the building permit process is ministerial, mainly to check for code compliance.
In other municipalities around the country, building plans are not scrutinized to the extent that they are in Hawaii counties. In Hawaii, the plan review is to ensure that the design meets all applicable codes. However, in other municipalities, the plans are used as a guide while code compliance verification is completed upon inspection of the project during construction. Inspectors who find that construction does not satisfy the code either have the correction made in the field or stop construction until proper corrective actions have been taken to ensure that new construction meets the code. Ultimately, the designer and contractor are responsible for ensuring new construction meets all applicable codes.
Accordingly, the purpose of this Act is to establish procedures and requirements for single-family and multi-family homes to apply for an expedited permit until June 30, 2031.
SECTION 2. Chapter 46, Hawaii Revised Statutes, is amended by adding a new section to be appropriately designated and to read as follows:
"§46- Expedited permits; single-family and
multi-family housing project permit applications; review time eligibility. (a)
Permit applications for single-family and multi-family housing projects
in each county shall be eligible for an expedited permit approval pursuant to
this section.
(b) An
applicant or the applicant's agent may submit a request to the county for an
expedited permit if sixty business days have lapsed after the application was
considered complete by the relevant agency and the application has not received
full approval by the county. The request
by the applicant or the applicant's agent shall include:
(1) A full and complete set of plans;
(2) Statements or evidence from the
relevant permitting agencies that adequate infrastructure capacity is available
to service the project site and specified improvements;
(3) The following information from all licensed
professionals on record:
(A) Policies of insurance that:
(i) Name the State and county as
additional insurers;
(ii) Are in amounts equivalent to at
least $2,000,000; and
(iii) Specifically allow coverage for the
completed project for the period under section 657-8; and
(B) A statement that indemnifies and
holds harmless the State, its officers, agents, and employees and the county,
its officers, agents, and employees;
(4) A statement that sixty business days
have lapsed without approval since the application would have been considered
complete by the relevant agency; and
(5) The required county contractor's
statement.
(c)
For the purposes of subsection (b),
applications shall only be considered complete if:
(1) Either:
(A) Qualified professionals who meet
state historic preservation division rules governing professional
qualifications for architecture, archaeology, architectural history, or
physical anthropology have made a reasonable and good‑faith determination
that the project does not have the potential to affect historic properties,
archaeological resources, or burial sites; or
(B) The project has been submitted to
the state historic preservation division of the department of land and natural
resources and the chapter 6E process has been completed, including for those
situations in which the county professional described in subparagraph (A)
determines that the project may have the potential to affect historic
properties, archaeological resources, or burial sites;
(2) The applicant submits documentation
evidencing that the proposed project does not encroach on special flood hazard
areas identified as "A" or "V" zones on the Federal
Emergency Management Agency's Flood Insurance Rate Maps, or the applicable
county official has reviewed the proposed project for floodplain management
compliance and has issued a development permit for construction;
(3) The project is not higher than
thirty feet;
(4) The project is not situated on a
shoreline parcel or a parcel that is impacted by waves, storm waves, high tide,
or shoreline erosion and is in compliance with all laws, rules, and procedures
pursuant to chapter 205A;
(5) All plans and specifications
submitted to a county have been stamped by a duly licensed structural, civil,
electrical, or mechanical engineer and licensed professional, as applicable,
certifying compliance with the applicable building codes for the respective
county; and
(6) Any other administrative criteria
that the county deems necessary to carry out the purpose of this section.
If the
county determines that the application is not complete, the county shall notify
the applicant and specify the information needed to meet the requirements for
complete submittal under this subsection.
(d) For applications under section 444-2.5, the
owner listed on the application shall instead execute a waiver of all claims
against the State and county and execute a statement that indemnifies and holds
harmless the State, its officers, agents, and employees and the county, its
officers, agents, and employees in lieu of subsection (b)(3). All expedited approval requests by the
applicant shall be reviewed for completeness by the county within five days of
submittal. For building permits that
apply for and meet the criteria for an expedited permit, the county shall
execute an agreement with the licensed professional on record as assuming
approval and oversight responsibility for the permit application. Upon completion of the agreement, the county
shall consider the application approved by the licensed professional, issue an expedited
permit, and the applicant may proceed with construction.
(e) After approval, the licensed professional on
record or county shall ensure that the project construction is in compliance
with the approved plans under the expedited permit, including but not limited
to the requirements under chapter 6E and all applicable ordinances regarding
land use, set‑back, height, and site development requirements for the
project site. State and county
inspectors shall not be precluded from entering and inspecting project sites
with expedited permits. Licensed
professionals and contractors shall address any defects in construction identified
by state or county inspectors; provided that the defects in construction are
consistent with the specifications in the approved plans. If the defects are not consistent with the
approved plans, the licensed professional shall note the disagreement and
assume review responsibility as the approving authority or initiate a change to
the plans to address the defect. Consistent with the requirements and time
periods established by each county, all licensed contractors and the licensed
professional or the licensed contractors' or licensed professional's successor
agents shall maintain a record of inspected structural, civil, plumbing, and
electrical systems after a certificate of occupancy is issued and provide a
copy of that record to the applicant and the county.
(f) Upon completion of construction, the licensed
professional shall certify in writing to the county that a certificate of
occupancy is warranted and all laws, rules, ordinances, and conditions
governing permitted construction have been met, along with any necessary
as-built drawings consistent with the requirements of each county. The county shall issue the certificate to the
applicant and may notate that the certificate is approved by the licensed
professional under an agreement pursuant to an expedited permit, and not a
county official.
(g) Each county may adopt rules pursuant to
chapter 91 to effectuate the purposes of this section and charge any necessary
fees, including defining what constitutes the sixty-day period, which may
exclude any time spent awaiting substantive responses or revisions from the
applicant necessary to address comments issued during the review process.
(h) Nothing in this section shall be construed to
allow any violation of federal, state, or county laws, rules, or ordinances. The issuance of a certificate of occupancy
shall not be construed to limit or repeal any powers of any county to enforce
violations of any law, ordinance, or rule."
SECTION 3. New statutory material is underscored.
SECTION 4. This Act shall take effect on July 1, 2026, and shall be repealed on June 30, 2031.
Report Title:
Housing; Counties; Permits; Permitting Agencies; Licensed Professionals; Expedited Permit; Applications; Requirements
Description:
Establishes procedures and requirements for single-family and multi-family housing project applicants to apply for an expedited permit, including requirements for completeness of expedited permit applications, duties of licensed professionals and the counties during construction, and applications for owner-builder exemptions. Takes effect 7/1/2026. Sunsets 6/30/2031. (CD1)
The summary description
of legislation appearing on this page is for informational purposes only and is
not legislation or evidence of legislative intent.