THE SENATE

S.B. NO.

1608

THIRTY-SECOND LEGISLATURE, 2023

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of the eleventh senatorial district.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The purpose of this Act is to appropriate funds for capital improvement projects in the eleventh senatorial district.

     SECTION 2.  The director of finance is authorized to issue general obligation bonds in the sum of $56,088,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2023-2024 for the purpose of financing capital improvement projects for the eleventh senatorial district, as follows:

To be expended by the department of education:

1.   Hokulani elementary school

     A.   Construction and equipment to repaint the exterior of each building.

          Construction                                   $20,000

          Equipment                                      $50,000

               Total funding                             $70,000

     B.   Construction and equipment to repave the parking lot and driveway.

          Construction                                   $ 5,000

          Equipment                                      $30,000

               Total funding                             $35,000

     C.   Construction and equipment to replace the playground equipment behind C building.

          Construction                                   $ 5,000

          Equipment                                      $20,000

               Total funding                             $25,000

     D.   Plans, design, construction, and equipment to install an elevator to make the library accessible, in compliance with the Americans with Disabilities Act of 1990.

          Plans                                         $ 5,000

          Design                                        $ 5,000

          Construction                                   $10,000

          Equipment                                      $30,000

               Total funding                             $50,000

2.   Lincoln elementary school

     A.   Design and construction for a covered play court.

          Design                                     $  600,000

          Construction                                $1,400,000

               Total funding                          $2,000,000

     B.   Design and construction for an electrical infrastructure upgrade.

          Design                                     $  600,000

          Construction                                $1,400,000

               Total funding                          $2,000,000

     C.   Design and construction for a parking lot expansion.

          Design                                     $  250,000

          Construction                                $1,750,000

               Total funding                          $2,000,000

     D.   Design and construction for landscape and irrigation improvements.

          Design                                       $ 90,000

          Construction                                  $260,000

               Total funding                            $350,000

3.   Manoa elementary school

     A.   Design, construction, and equipment to convert rooms for multiple usage.

          Design                                       $  4,000

          Construction                                  $400,000

          Equipment                                     $100,000

               Total funding                            $504,000

     B.   Design, construction, and equipment for constructing an outdoor learning space and garden.

          Design                                       $  4,000

          Construction                                  $400,000

          Equipment                                     $100,000

               Total funding                            $504,000

4.   Noelani elementary school.

     A.   Construction to reroof covered walkway and for structural repairs and expansion.

          Construction                                $2,000,000

               Total funding                          $2,000,000

     B.   Construction to resurface outdoor court.

          Construction                                  $500,000

               Total funding                            $500,000

     C.   Construction for an A building playground.

          Construction                                  $250,000

               Total funding                            $250,000

5.   Roosevelt high school

     A.   Plans and construction for new music facilities with classrooms, practice rooms, teacher offices, and other related facilities; ground and site improvements; equipment and appurtenances; and related improvements.

          Plans                                     $ 2,000,000

          Construction                               $15,000,000

               Total funding                         $17,000,000

     B.   Plans and construction for reconstructing the access ramp to upper campus, between A building and C building.

          Plans                                      $  500,000

          Construction                                $2,000,000

               Total funding                          $2,500,000

6.   Stevenson middle school

     A.   Construction for an electrical upgrade.

          Construction                                  $300,000

               Total funding                            $300,000

     B.   Construction and equipment for renovating and building physical education buildings, including classrooms, storage, shower rooms, and a covered basketball court.

          Construction                               $10,000,000

          Equipment                                  $   200,000

               Total funding                         $10,200,000

     C.   Construction and equipment for renovating and rebuilding the music facility for band, orchestra, hula, and general music classes, with soundproofing between learning spaces.

          Construction                               $15,000,000

          Equipment                                  $   300,000

               Total funding                         $15,300,000

To be expended by the department of land and natural resources:

7.   Division of forestry and wildlife baseyard fencing, Oahu

          Construction for the installation of fencing abutting the division of forestry and wildlife Oahu baseyard between the Hawaii Nature Center and 2260 Makiki Heights Drive.

          Construction                                  $500,000

               Total funding                            $500,000

     SECTION 3.  The appropriations made by this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2026, shall lapse as of that date.

     SECTION 4.  The sums appropriated for the respective capital improvement projects set forth in section 2 shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 5.  This Act shall take effect on July 1, 2023.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 11th Senatorial District; Appropriation

 

Description:

Authorizes the issuance of general obligation bonds and appropriates funds for capital improvement projects in the 11th senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.