HOUSE OF REPRESENTATIVES
THE TWENTY-EIGHTH LEGISLATURE
REGULAR SESSION OF 2015
|
Rep. Chris Lee, Chair |
|
Rep. Nicole E. Lowen, Vice Chair |
|
Rep. Ty J.K. Cullen |
Rep. Calvin K.Y. Say |
|
Rep. Cindy Evans |
Rep. Ryan I. Yamane |
|
Rep. Kaniela Ing |
Rep. Feki Pouha |
|
Rep. Scott Y. Nishimoto |
Rep. Cynthia Thielen |
CORRECTED NOTICE OF DECISION MAKING
|
DATE: |
Tuesday, February 10, 2015 |
|
TIME: |
11:30 a.m. |
|
PLACE: |
Conference Room 325 State Capitol 415 South Beretania Street |
A G E N D A
The following bill(s) is for decision-making purposes
only to insert substantive provisions into the short form bill. A public
hearing will be scheduled at a later date, at which time testimony will be
accepted.
The following measure(s) were previously heard on February 05, 2015 at 8:30 a.m..
|
RELATING TO ENERGY RESOURCES. Requires the Public Utilities Commission to commence a proceeding by September 1, 2015, regarding equity for all ratepayers in net energy metering.
|
EEP, CPC, FIN |
|
|
RELATING TO THE MERGER, ACQUISITION, AND CONSOLIDATION OF ELECTRIC UTILITIES. Requires the PUC to apply certain standards and criteria and hold a public hearing to determine whether to approve a merger, acquisition, or consolidation of an electric utility.
|
EEP, CPC, FIN |
|
|
RELATING TO PERFORMANCE-BASED REGULATION. Establishes performance-based criteria from which the PUC must periodically establish goals that the electric utility companies must meet or be subject to the imposition of conditions.
|
EEP, CPC, FIN |
|
|
RELATING TO ENERGY. Requires the legislative reference bureau to analyze different public utility models followed in the United States and compare them with the utility model followed in Hawaii. Appropriates funds.
|
EEP, CPC, FIN |
|
|
RELATING TO THE INTERISLAND HIGH-VOLTAGE ELECTRIC TRANSMISSION CABLE SYSTEM. Removes the authorization granted to the public utilities commission to establish a regulatory structure for the installation and implementation of an interisland high-voltage electric transmission cable system by repealing chapter 269, part VIII, Hawaii Revised Statutes, and making conforming amendments.
|
EEP, CPC/JUD |
|
|
RELATING TO ENERGY. Requires the PUC to establish a process for the creation of integrated energy districts.
|
EEP, CPC |
The following measure was previously heard on February 03, 2015 at 8:30 a.m..
|
RELATING TO ENERGY STORAGE. Establishes an income tax credit for each grid-connected energy storage property that is installed and placed in service in the State during the taxable year beginning after 12/31/2015; provided that this tax credit shall not be available for taxable years beginning after 12/31/2026. Allows the tax credit to be claimed as either an investment credit or utilization credit. Appropriates funds to administer the tax credit.
|
EEP, CPC, FIN |
|
|
|
|
|
As this is a decision making meeting only, no public testimony will be accepted.
If you require special assistance or auxiliary aids and/or services to participate in the House public hearing process (i.e., sign or foreign language interpreter or wheelchair accessibility), please contact the Committee Clerk at 586-9450 at least 24 hours prior to the hearing for arrangements. Prompt requests submitted help to ensure the availability of qualified individuals and appropriate accommodations.
For further information, please call the Committee Clerk at 586-9450.
Selected meetings are broadcast live. Check the current legislative broadcast schedule on the "Capitol TV" website at www.capitoltv.org or call 536-2100.
|
|
|
________________________________________ Rep. Chris Lee Chair |
|
|
|
|