| Measure Title: | RELATING TO PUBLIC UTILITIES. |
| Report Title: | Public Utilities; Electric; Progressive Block Rates |
| Description: | Requires electric utilities to apply a progressive block rate structure for residential consumers that charges a higher rate to consumers with a monthly consumption of over 500 kWh than to consumers with a monthly consumption of 500 kWh or less. (HB1941 HD1) |
| Package: | None |
| Companion: | |
| Introducer(s): | EVANS, HALE, HERKES, MORITA |
| Current Referral: | EEP, CPC, FIN |
| Date | Status Text | |
|---|---|---|
| 1/19/2006 | H | To be Introduced |
| 1/20/2006 | H | Introduced and Pass First Reading |
| 1/23/2006 | H | Referred to EEP, CPC, FIN, referral sheet 2 |
| 1/30/2006 | H | Bill scheduled to be heard by EEP on Thursday, 02-02-06 at 9:30 am in House conference room 312. |
| 2/2/2006 | H | The committees on EEP recommend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 6 Ayes: Representative(s) Morita, Evans, Berg, Waters, Pine, Thielen; Ayes with reservations: none; 0 Noes: none; and 4 Excused: Representative(s) Carroll, Harbin, Kanoho, Schatz. |
| 2/9/2006 | H | Reported from the committee on EEP (Stand. Com. Rep. No. 208-06) as amended in (HD 1), recommending passage on Second Reading and referral to the committee on CPC. |
| 2/10/2006 | H | Passed Second Reading as amended in (HD 1) and referred to the committee(s) on CPC with none voting no (0) and Arakaki, Cabanilla, Saiki, Schatz, Takamine excused (5). |
$ = Appropriation measure
ConAm = Constitutional Amendment