| Measure Title: | RELATING TO SCHOOLS. |
| Report Title: | King Intermediate; Asbestos ($) |
| Description: | Requires the department of education to conduct asbestos tests prior to renovations or painting of school facilities at King intermediate. Appropriates funds for asbestos testing of King intermediate school students. |
| Package: | None |
| Companion: | |
| Introducer(s): | HEE |
| Current Referral: | EDM, WAM |
| Date | Status Text | |
|---|---|---|
| 1/27/2005 | S | Introduced. |
| 1/31/2005 | S | Passed First Reading. |
| 2/1/2005 | S | Referred to EDM, WAM. |
| 2/9/2005 | S | The committee on EDM has scheduled a public hearing on 02-16-05 at 1:15 pm in conference room 225. |
| 2/16/2005 | S | The measure is deferred. |
$ = Appropriation measure
ConAm = Constitutional Amendment