Measure Title: | RELATING TO THE PUBLIC UTILITIES COMMISSION. |
Report Title: | PUC; Capital Projects |
Description: | Bifurcates the process of authorizing capital projects by separating need and reasonable route or location of facilities or infrastructure, by requiring a utility to obtain formal authorization of need for a capital cost above $500,000 to be completed before any permits can be issued to utilities for proposed uses. |
Package: | None |
Companion: | |
Introducer(s): | TANIGUCHI |
Current Referral: | ENE, CPH |
Date | Status Text | |
---|---|---|
1/17/2003 | S | Introduced and passed First Reading. |
1/22/2003 | S | Referred to ENE, CPH. |
8/21/2003 | D | Carried over to 2004 Regular Session. |
$ = Appropriation measure
ConAm = Constitutional Amendment