| Measure Title: | RELATING TO THE PUBLIC UTILITIES COMMISSION. |
| Report Title: | PUC; Capital Projects |
| Description: | Bifurcates the process of authorizing capital projects by separating need and reasonable route or location of facilities or infrastructure, by requiring a utility to obtain formal authorization of need for a capital cost above $500,000 to be completed before any permits can be issued to utilities for proposed uses. |
| Package: | None |
| Companion: | |
| Introducer(s): | TANIGUCHI |
| Current Referral: | ENE, CPH |
| Date | Status Text | |
|---|---|---|
| 1/17/2003 | S | Introduced and passed First Reading. |
| 1/22/2003 | S | Referred to ENE, CPH. |
| 8/21/2003 | D | Carried over to 2004 Regular Session. |
$ = Appropriation measure
ConAm = Constitutional Amendment