| Measure Title: | RELATING TO PROCUREMENT CODE. |
| Report Title: | Procurement Code |
| Description: | Requires that after a construction contract is awarded, a pre-job conference is required between the state or county representatives, the prime contractor, and all subcontractors involved. |
| Package: | None |
| Companion: | |
| Introducer(s): | KAWAMOTO |
| Current Referral: | TMG |
| Date | Status Text | |
|---|---|---|
| 1/22/2003 | S | Introduced and passed First Reading. |
| 1/27/2003 | S | Referred to TMG. |
| 2/21/2003 | S | Bill scheduled to be heard by TMG on 02-26-03 at 2:45 pm in conference room 229. |
| 2/26/2003 | S | The committee(s) on TMG recommend(s) that the measure be HELD. The votes in TMG were as follows: 4 Aye(s): Kawamoto, Espero, Aduja, Menor; Aye(s) with reservations: none ; 0 No(es): none; and 3 Excused: Baker, Kanno, Whalen. |
| 8/21/2003 | D | Carried over to 2004 Regular Session. |