| Measure Title: | RELATING TO UTILITY LINES. |
| Report Title: | Utility Lines; Construction and Installation Moratorium |
| Description: | Establishes a 3-year moratorium on the construction and installation of 138 kilovolt or greater high-voltage electric transmission lines or systems. |
| Package: | None |
| Companion: | |
| Introducer(s): | TANIGUCHI |
| Current Referral: | CPH |
| Date | Status Text | |
|---|---|---|
| 1/17/2003 | S | Introduced and passed First Reading. |
| 1/22/2003 | S | Referred to CPH. |
| 8/21/2003 | D | Carried over to 2004 Regular Session. |