| Measure Title: | RELATING TO THE PUBLIC UTILITIES COMMISSION. |
| Report Title: | PUC, Intervenor Program, Website ($) |
| Description: | Requires the PUC to establish an intervenor program outside the scope of the consumer advocate. Appropriates money to the PUC for a website. |
| Package: | None |
| Companion: | |
| Introducer(s): | TANIGUCHI |
| Current Referral: | CPH, WAM |
| Date | Status Text | |
|---|---|---|
| 1/22/2002 | S | Introduced and passed First Reading. |
| 1/28/2002 | S | Referred to CPH, WAM. |
$ = Appropriation measure
ConAm = Constitutional Amendment