Measure Title: | RELATING TO UTILITY LINES. |
Report Title: | Utility Lines; Construction Moratorium; Advisory Committee ($) |
Description: | Establishes a three-year moratorium on the construction and installation of forty-six kilovolt or greater high-voltage electric transmission lines. Establishes an advisory committee to develop a statewide utility undergrounding plan and submit reports (interim: 2003, final: 2004). |
Package: | None |
Companion: | |
Introducer(s): | TANIGUCHI |
Current Referral: | WLE/CPH, WAM |
Date | Status Text | |
---|---|---|
1/18/2002 | S | Introduced and passed First Reading. |
1/25/2002 | S | Referred to WLE/CPH, WAM. |
$ = Appropriation measure