| Measure Title: | RELATING TO UTILITY LINES. |
| Report Title: | Utility Lines; Construction Moratorium; Advisory Committee ($) |
| Description: | Establishes a three-year moratorium on the construction and installation of forty-six kilovolt or greater high-voltage electric transmission lines. Establishes an advisory committee to develop a statewide utility undergrounding plan. |
| Package: | None |
| Companion: | |
| Introducer(s): | CASE |
| Current Referral: | EEP, CPC, FIN |
| Date | Status Text | |
|---|---|---|
| 1/23/2002 | H | Introduced |
| 1/25/2002 | H | Pass First Reading |
| 1/30/2002 | H | Referred to EEP, CPC, FIN, referral sheet 5 |
$ = Appropriation measure
ConAm = Constitutional Amendment