Report Title:

CIP; 20th Senatorial District

 

Description:

Appropriates funds for capital improvement projects in the twentieth senatorial district

THE SENATE

S.B. NO.

3057

TWENTY-FIRST LEGISLATURE, 2002

 

STATE OF HAWAII

 


 

A BILL FOR AN ACT

 

RELATING TO CAPITAL IMPROVEMENTS FOR THE twentieth SENATORIAL DISTRICT.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $199,602,874, or so much thereof as may be necessary, for fiscal year 2002-2003, for the following capital improvements in the twentieth senatorial district:

1. Barbers Point Elementary School

A. Design and construction for air conditioning of classroom and administration buildings B, C, E, F, G, H.

Design $150,000

Construction $2,550,000

Equipment $100,000

Total funding $3,800,000

B. Install rubberized surfacing beneath newly installed playground equipment; three sets.

Design $11,000

Construction $65,000

Total funding $76,000

C. Design and construction of an accessible pathway from building C to grade K playground equipment.

Design $1,000

Construction $5,000

Total funding $6,000

D. Design and install sprinkler/irrigation system.

Design $5,000

Construction $125,000

Total funding $130,000

E. Design and construction of paved parking area along Cophaee Street.

Total funding $53,000

2. Campbell High School

A. Air conditioning for entire school.

Design $600,000

Construction $10,000,000

Equipment $543,000

Total funding $11,143,000

B. Parking lot lighting improvements.

Design $5,000

Construction $100,000

Total funding $105,000

C. Construction of girl's locker room.

Design $200,000

Construction $3,400,000

Equipment $20,000

Total funding $3,620,000

D. Installation of permanent bleachers for football field.

Design $200,000

Construction $3,780,000

Total funding $3,980,000

E. Four tennis courts.

Design $30,000

Construction $180,000

Total funding $210,000

F. Scoreboard of softball field.

Design $20,000

Construction $123,000

Total funding $143,000

G. Scorer's booth for softball field.

Design $5,000

Construction $40,000

Total funding $45,000

H. Announcer's booth with elevator for football program.

Design $40,000

Construction $360,000

Total funding $400,000

3. Ewa Beach Elementary School

A. Design and construction of six classroom buildings to replace portables.

Design $300,000

Construction $2,500,000

Equipment $100,000

Total funding $2,900,000

B. Air-conditioning for the entire school.

Design $170,000

Construction $2,652,000

Total funding $2,822,000

C. Renovation and upgrade of electrical system.

Design $40,000

Construction $380,000

Total funding $420,000

D. Convert kitchen and dining hall into classroom, equipment, ground and site improvements.

Design $80,000

Construction $915,000

Total funding $995,000

4. Ewa Elementary School

A. Air-conditioning for entire school.

Design $170,000

Construction $2,652,000

Total funding $2,822,000

B. Replace glass windows in Building L.

Construction $20,000

C. Air-conditioning for Building L $350,000

D. Air-conditioning for Building I $750,000

5. Holomua Elementary School

A. Install concrete slab between Building E and K-2 playground equipment.

Design $2,000

Construction $18,000

Total funding $20,000

6. Ilima Intermediate School

A. Air-conditioning for entire school.

Design $300,000

Construction $4,800,000

Equipment $52,000

Total funding $5,152,000

B. Landscaping and installation of watering system throughout campus.

Design $10,000

Construction $190,000

Total funding $200,000

C. Traffic light in front of school.

Design $15,000

Construction $290,000

Total funding $305,000

D. Parking lot improvements.

Design $11,000

Construction $200,000

Total funding $211,000

7. Iroquois Point Elementary School

A. Physical Education Center

Design $3,000

Construction $22,000

Total funding $25,000

B. Driveway and Parking lot for 15 cars and bus turnaround

Design $14,000

Construction $86,000

Total funding $100,000

8. Kaimiloa Elementary School

A. Design and construction of 8 classroom buildings to replace portables.

Design $200,000

Construction $2,750,000

Equipment $60,000

Total funding $3,010,000

B. Air conditioning for entire school.

Design $220,000

Construction $4,230,000

Total funding $4,450,000

9. Kaleiopuu Elementary School

A. Design and construction of emergency exit with ramp at rear of school.

Design $15,000

Construction $155,000

Total funding $170,000

B. Construction of concrete fire break in rear of school.

Design $2,000

Construction $14,000

Total funding $16,000

C. Renovation of fire rescue area on second floor of Building G.

Design $5,000

Construction $105,000

Total funding $110,000

D. Design and construction of a retaining wall on the entire mauka side of the campus.

Design $20,000

Construction $250,000

Total funding $270,000

E. Extend mauka side fire lanes to have access to school.

Design $3,000

Construction $42,000

Total funding $45,000

10. Kapolei Elementary School

A. Traffic lights in the following locations: Intersection of Kuloa Avenue and Kamaaha Loop and intersection of Kumu Iki and Kamaaha Avenue.

Design $60,000

Construction $620,000

Equipment $1,000

Total funding $681,000

11. Kapolei High School

a. Completion of school.

Construction $26,000,000

Equipment $1,000,000

Total funding $27,000,000

12. Makakilo Elementary School

A. Building H classroom air conditioning.

Design $12,000

Construction $63,000

Total funding $75,000

B. Building H, replace existing door with sealed gasket type.

Design $2,000

Construction $10,000

Total funding $12,000

C. Building H, replace wooden louvers with airtight windows.

Design $2,000

Construction $10,000

Total funding $12,000

D. Library, replace exiting doors with sealed gasket type.

Design $4,000

Construction $21,000

Total funding $25,000

E. Library, replace wooden louvers with airtight windows.

Design $8,000

Construction $42,000

Total funding $50,000

F. Library, install automatic closing dampers.

Design $2,000

Construction $10,000

Total funding $12,000

G. Cafeteria, install windows with security screen.

Design $4,000

Construction $21,000

Total funding $25,000

H. Build walkway and safety rails between building H and C.

Design $8,000

Construction $42,000

Total funding $50,000

I. Install night lighting around campus buildings.

Design $12,000

Construction $63,000

Total funding $75,000

J. Renovation and upgrade of electrical system.

Design $70,000

Construction $420,000

Total funding $490,000

K. Install air conditioning in every classroom.

Design $12,000

Construction $63,000

Total funding $75,000

L. Install water sprinkling system around campus building.

Design $4,000

Construction $21,000

Total funding $25,000

M. Design and construction of new parking area at rear of school.

Design $15,000

Construction $85,000

Total funding $100,000

Total funding $1,026,000

13. Mauka Lani Elementary School

A. Install elevator in Building A.

Design $15,000

Construction $200,000

Total funding $215,000

b. Design and construction of 2-story classroom building.

Design $200,000

Construction $2,750,000

Equipment $60,000

Total funding $3,010,000

14. Ocean Pointe Elementary School

Design $100,000

Construction $1,100,000

Total funding $1,200,000

15. Pohakea Elementary School

a. Air conditioning for entire school. $4,263,000

B. Renovations to Administration Building.

Design $3,000

Construction $11,000

Total funding $14,000

16. Royal Kunia Elementary School

Design $100,000

Construction $1,100,000

Total funding $1,200,000

17. Waipahu Intermediate School

A. Design, construction, equipment, and site improvements: Cafetorium

Design $270,000

Construction $2,600,000

Equipment $125,000

Total funding $2,995,000

b. Design and construction of eight classroom buildings.

Design $200,000

Construction $2,750,000

Equipment $60,000

Total funding $3,010,000

18. Kapolei Parkway Roadway

a. Planning, design, and construction of Kapolei Parkway Roadway extension from Kapolei Parkway to North/South Road. $4,723,874

19. Kapolei Library

A. Furniture and equipment and staffing. $1,200,000

B. Phase II

Plan $500,000

Design $500,000

Construction $9,500,000

Equipment $500,000

Total funding $11,000,000

20. Fort Weaver Road

A. Traffic Light Cameras – Laulaunui Street to Old Ft. Weaver

Construction and Design $660,000

21. Kunia Road Widening

a. Well abandonment and relocation.

Design $150,000

Construction $2,000,000

Total funding $2,150,000

22. Ft. Barrette Road Widening, Farrington Highway to Kalaeloa

Design $825,000

Land $570,000

Construction $6,075,000

Total funding $7,470,000

23. Ft. Weaver Road Sidewalks, Geiger Road to Family Center

Design $240,000

Construction $1,600,000

Total funding $1,840,000

24. Ft. Weaver Road Sidewalks, Geiger Road to Papipi Road

Design $85,000

Construction $560,000

Total funding $645,000

25. Intra-Island Commuter Ferry Project

a. West Oahu to Honolulu Harbor $1,000,000

26. Kapolei Family Court Complex

a. Design and Construction

Plans $74,500,000

SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended for the purposes of this Act; provided that:

(1) The sums appropriated in items 1 to 9, 11 to 17, 19, and 26 shall be expended by the department of accounting and general services; and

(2) The sums appropriated in items 10, 18, and 20 to 25 shall be expended by the department of transportation.

SECTION 3. This Act shall take effect on July 1, 2002.

INTRODUCED BY:

_____________________________