REPORT TITLE:
CIP; 12th Senatorial District


DESCRIPTION:
Appropriates funds for capital improvement projects for the 12th
senatorial district.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                        
THE SENATE                              S.B. NO.           2737
TWENTIETH LEGISLATURE, 2000                                
STATE OF HAWAII                                            
                                                             
________________________________________________________________
________________________________________________________________


                   A  BILL  FOR  AN  ACT

RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE
   12TH SENATORIAL DISTRICT.



BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 1      SECTION 1.  The following sums, or so much thereof as shall
 
 2 be sufficient to finance the projects listed in this Act, are
 
 3 hereby appropriated out of the general revenues of the State of
 
 4 Hawaii for fiscal year 2000-2001.
 
 5      1.  To be expended by the department of accounting and
 
 6 general services:
 
 7      A.   McKinley High School, Honolulu
 
 8           1.   Expansion of existing facilities in
 
 9                the auto shop and electronics shop.  $   4,000,000
 
10           2.   Construction of new building for
 
11                physical education classrooms and
 
12                girls' athletic lockers to meet
 
13                Title VIII needs.                        3,500,000
 
14                       Total funding                  $  7,500,000
 
15      B.   Queen Kaahumanu School, Honolulu
 
16           1.   Air conditioning for Building G.      $    700,000
 
17           2.   Covered walkway from Building C to
 
18                Building F.                                 80,000
 
19           3.   Sidewalk from portable classrooms to
 

 
Page 2                                                     
                                     S.B. NO.           2737
                                                        
                                                        

 
 1                Building G.                                 20,000
 
 2                       Total funding                  $    800,000
 
 3      C.   Stevenson Middle School, Honolulu
 
 4           1.   Security and liability retrofit,
 
 5                including installation of metal
 
 6                gates, screen tiles, and railings
 
 7                for Building A.
 
 8                    Plans and design                  $     80,000
 
 9                    Construction                           180,000
 
10                    Equipment and materials                 35,000
 
11                       Total funding                  $    295,000
 
12      D.   Lincoln Elementary School, Honolulu
 
13           1.   Safe playground surfacing material
 
14                and frames for play apparatus and
 
15                wheelchair accessibility.
 
16                    Design                            $     15,000
 
17                    Construction                            60,000
 
18                       Total funding                  $     75,000
 
19           2.   Resurfacing parking lot for vehicle
 
20                and pedestrian safety.
 
21                    Design                            $     25,000
 
22                    Construction                           100,000
 
23                       Total funding                  $    125,000
 

 
Page 3                                                     
                                     S.B. NO.           2737
                                                        
                                                        

 
 1           3.   Reroofing Building E to repair
 
 2                leaks.
 
 3                    Design                            $     14,000
 
 4                    Construction                            56,000
 
 5                       Total funding                  $     70,000
 
 6           4.   Rerouting new drain line in kitchen
 
 7                to meet new health code
 
 8                requirements.
 
 9                    Design                            $     20,000
 
10                    Construction                            80,000
 
11                       Total funding                  $    100,000
 
12      E.   Roosevelt High School, Honolulu
 
13           1.   Expanding the existing band building
 
14                with another classroom 35 feet by 40
 
15                feet by 20 feet high.
 
16                    Design                            $     49,000
 
17                    Construction                           486,000
 
18                       Total funding                  $    535,000
 
19           2.   Renovating and repairing Building A,
 
20                phase I, including ground and site
 
21                improvements and equipment to meet
 
22                program and operational needs.
 
23                    Design                            $    200,000
 

 
Page 4                                                     
                                     S.B. NO.           2737
                                                        
                                                        

 
 1                    Construction                         5,900,000
 
 2                    Equipment                              100,000
 
 3                       Total funding                  $  6,200,000
 
 4      2.  To be expended by the department of land and natural
 
 5 resources:
 
 6      A.   Maunalaha Heights water system
 
 7           improvements to meet requirements of the
 
 8           the city and county of Honolulu fire
 
 9           department standards.
 
10           1.   1,900 L.F. 8-inch water line and six
 
11                fire hydrants, includes minimal
 
12                roadway for fire truck access.
 
13                    Plans                             $     35,000
 
14                    Design                                  58,000
 
15                    Construction                           567,000
 
16                       Total funding                  $    660,300
 
17      B.   Flood mitigation plan for Makiki Drainage
 
18           Area.
 
19           1.   Assessment of the entire watershed
 
20                and examining mitigation measures to
 
21                reduce flooding in the Makiki area.
 
22                    Plans                             $    125,000
 
23                       Total funding                  $    125,000
 

 
Page 5                                                     
                                     S.B. NO.           2737
                                                        
                                                        

 
 1      SECTION 2.  The sums appropriated for the respective capital
 
 2 projects set forth in section 1 shall be expended by the
 
 3 designated expending agency for the purposes of this Act.
 
 4      SECTION 3.  This Act shall take effect on July 1, 2000.
 
 5 
 
 6                           INTRODUCED BY:  _______________________