REPORT TITLE:
District CIP


DESCRIPTION:
Appropriates funds for various capital improvement projects for
the Thirty-Sixth Representative District.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                            1669        
HOUSE OF REPRESENTATIVES                H.B. NO.           
TWENTIETH LEGISLATURE, 1999                                
STATE OF HAWAII                                            
                                                             
________________________________________________________________
________________________________________________________________


                   A  BILL  FOR  AN  ACT

RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE
   THIRTY-SIXTH REPRESENTATIVE DISTRICT.



BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 1      SECTION 1.  The following sums, or so much thereof as shall
 
 2 be sufficient to finance the projects listed in this Act, are
 
 3 hereby appropriated out of the general revenues of the State of
 
 4 Hawaii for fiscal year 1999-2000.
 
 5      1.  To be expended by the department of accounting and
 
 6 general services:
 
 7      A.   August Ahrens elementary school, Oahu
 
 8           Design and construction to install air conditioning in
 
 9           20 portable classrooms.
 
10           Design                                         $ 42,000
 
11           Construction                                    378,000
 
12           Total funding                                   420,000
 
13      B.   Lehua elementary school, Oahu
 
14           Design and equipment to install air conditioning in
 
15           five classrooms in building A and five classrooms in
 
16           building B.
 
17           Design                                         $ 40,000
 
18           Equipment                                       323,000
 
19           Total funding                                   363,000
 

 
Page 2                                         1669        
                                     H.B. NO.           
                                                        
                                                        

 
 1      C.   Pearl City elementary school, Oahu
 
 2           Design and construction to build wheelchair ramps.
 
 3           Design                                           $1,000
 
 4           Construction                                      3,000
 
 5           Total funding                                     4,000
 
 6      D.   Pearl City elementary school, Oahu
 
 7           Design and construction to build three roofs (student
 
 8           coverings) for the handicap vans in the main parking
 
 9           lots.
 
10           Design                                          $ 8,000
 
11           Construction                                     52,000
 
12           Total funding                                    60,000
 
13      E.   Pearl City elementary school, Oahu
 
14           Design and construction to expand the library to meet
 
15           the department of education's specifications.
 
16           Design                                         $ 50,000
 
17           Construction                                    540,000
 
18           Total funding                                   590,000
 
19      F.   Pearl City Highlands elementary school, Oahu
 
20           Design and construction to build a covered walkway to
 
21           connect the library and cafeteria.
 
22           Design                                               $1
 
23           Construction                                          1
 
24           Total funding                                         1
 

 
Page 3                                         1669        
                                     H.B. NO.           
                                                        
                                                        

 
 1      G.   Waipahu elementary school, Oahu
 
 2           Design and construction to improve the surfacing and
 
 3           equipment of school playgrounds and courts.
 
 4           Design                                         $  1,000
 
 5           Construction                                    399,000
 
 6           Total funding                                   400,000
 
 7      H.   Waipahu intermediate school, Oahu
 
 8           Design and construction to renovate the boys and girls
 
 9           restrooms in buildings Y, J, M, C, S, and the boys
 
10           locker room.
 
11           Design                                       $  210,000
 
12           Construction                                  1,890,000
 
13           Total funding                                 2,100,000
 
14      I.   Pearl City high school, Oahu
 
15           Design, construction, and equipment to install a
 
16           school-wide PA system.
 
17           Design                                         $100,000
 
18           Construction                                    400,000
 
19           Equipment                                        20,000
 
20           Total funding                                   520,000
 
21      J.   Pearl City high school, Oahu
 
22           Design and construction to renovate the PCCC auditorium
 
23           to allow the emergency door to open to a walkway.
 

 
Page 4                                         1669        
                                     H.B. NO.           
                                                        
                                                        

 
 1           Design                                          $20,000
 
 2           Construction                                     55,000
 
 3           Total funding                                    75,000
 
 4      K.   Waipahu high school, Oahu
 
 5           Design, construction, and equipment to install a
 
 6           school-wide PA system, including the portable
 
 7           classrooms.
 
 8           Design                                         $ 50,000
 
 9           Construction                                    190,000
 
10           Equipment                                        10,000
 
11           Total funding                                   250,000
 
12      L.   Waipahu high school, Oahu
 
13           Design and construction to replace existing floor with
 
14           a hardwood floor in the gym.
 
15           Design                                         $ 20,000
 
16           Construction                                    480,000
 
17           Total funding                                   500,000
 
18      2.  To be expended by the University of Hawaii:
 
19      A.   Leeward community college, Oahu
 
20           Plans, design, and construction to build a third
 
21           observatory to house a 24-inch research telescope.
 
22           Plans                                          $  1,000
 
23           Design                                           44,000
 
24           Construction                                    450,000
 
25           Total funding                                   495,000
 

 
Page 5                                         1669        
                                     H.B. NO.           
                                                        
                                                        

 
 1      SECTION 2.  The sums appropriated for the respective capital
 
 2 projects set forth in section 1 shall be expended by the
 
 3 designated expending agency for the purposes of this Act.
 
 4      SECTION 3.  This Act shall take effect on July 1, 1999.
 
 5 
 
 6                           INTRODUCED BY:_________________________