REPORT TITLE:
CIP for 14th Sen District 


DESCRIPTION:
CIP for school improvements in the 14th senatorial district.

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                                        
HOUSE OF REPRESENTATIVES                H.B. NO.1650       
TWENTIETH LEGISLATURE, 1999                                
STATE OF HAWAII                                            
                                                             
________________________________________________________________
________________________________________________________________


                   A  BILL  FOR  AN  ACT

AUTHORIZING THE ISSUANCE OF GENERAL OBLIGATION BONDS AND MAKING
   AN APPROPRIATION FOR CAPITAL IMPROVEMENT PROJECTS FOR THE
   FOURTEENTH SENATORIAL DISTRICT.


BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 1      SECTION 1.  The director of finance is authorized to issue
 
 2 general obligation bonds in the sum of $            , or so much
 
 3 thereof as may be necessary, and the same sum, or so much thereof
 
 4 as may be necessary, is appropriated for fiscal year 1999-2000,
 
 5 for the following projects for the fourteenth senatorial
 
 6 district, Oahu:
 
 7      1.   FERN ELEMENTARY SCHOOL
 
 8           Upgrade electrical and telephone capacity   $    10,000
 
 9           Installation of gates in front and rear 
 
10                parking areas                          $    11,000
 
11           Campus drainage improvements                $          
 
12           Renovation of building B                    $          
 
13                                             TOTAL   $       
 
14      2.   KAIULANI ELEMENTARY SCHOOL
 
15                                             TOTAL   $       
 
16      3.   KALIHI ELEMENTARY SCHOOL
 
17           Replacement and installation of playground
 
18                equipment and padded ground cover
 
19                for three work areas                   $   100,000
 

 
Page 2                                                     
                                     H.B. NO.1650       
                                                        
                                                        

 
 1           Repavement of upper playground court
 
 2                Planning                               $     5,000
 
 3                Design                                 $     5,000
 
 4                Construction                           $     60,00
 
 5           Loading ramp for cafeteria
 
 6                Planning                               $     5,000
 
 7                Design                                 $     5,000
 
 8                Construction                           $    30,000
 
 9           Loading ramp for administration office
 
10                Planning                               $     5,000
 
11                Design                                 $     5,000
 
12                Construction                           $    50,000
 
13                                             TOTAL   $   270,000
 
14      4.   KALIHI-KAI ELEMENTARY SCHOOL
 
15           Improve campus drainage* on going           $          
 
16           Playground safety                           $    14,700
 
17                                             TOTAL   $       
 
18      5.   KALIHI-UKA ELEMENTARY SCHOOL
 
19           Student d/o and drive-thru.  Parking lot 
 
20                expansion                              $   443,000
 
21                                             TOTAL   $   443,000
 
22      6.   KALIHI-WAENA ELEMENTARY SCHOOL
 
23           Installation of sprinkler system and 
 
24                landscaping of playground areas        $    15,000
 

 
Page 3                                                     
                                     H.B. NO.1650       
                                                        
                                                        

 
 1           Electrical upgrade 
 
 2                (not a requirement but waiting 
 
 3                for existing CIP)
 
 4           Library air conditioning                    $   150,000
 
 5           Parking lot extension                       $   100,000
 
 6           Wall partitions replacement                 $    80,000
 
 7                                             TOTAL   $   345,000
 
 8      7.   KAPALAMA ELEMENTARY SCHOOL
 
 9           Playground safety                           $    25,180
 
10                                             TOTAL   $    25,180
 
11      8.   KAULUWELA ELEMENTARY SCHOOL
 
12           Tree trimming                               $     8,000
 
13           Outdoor stage renovation                    $    10,000
 
14           Parking lot renovation                      $     8,000
 
15           Restroom renovation                         $    20,000
 
16                                             TOTAL   $    46,000
 
17      9.   LANAKILA ELEMENTARY SCHOOL
 
18           Construct retaining wall to restrict
 
19                overflow of rain water and dirt 
 
20                to bldg. A                                        
 
21                Design                                 $     2,000
 
22                Construction                           $    15,000
 

 
 
 
Page 4                                                     
                                     H.B. NO.1650       
                                                        
                                                        

 
 1           Pave small portion of dirt area to
 
 2                provide sufficient parking for
 
 3                staff members                                     
 
 4                Design                                 $     2,000
 
 5                Construction                           $    10,000
 
 6           Replace lighting fixtures in all
 
 7                classrooms to meet OSHA standard
 
 8                of candlelight power                              
 
 9                Design                                 $    20,000
 
10                Construction                           $   200,000
 
11                                             TOTAL   $   249,000
 
12     10.   LIKELIKE ELEMENTARY SCHOOL
 
13           Grade land between Buildings A and E        $    30,000
 
14           Replacement of playground equipment         $    25,000
 
15           Installation of air conditioning for computer 
 
16                lab and upgrade electrical lines       $    10,000
 
17           Construction of covered walkway to 
 
18                cafeteria                              $    30,000
 
19           Repaint buildings A, B, C, & D              $          
 
20           Redesign parking lot to create a dropoff  
 
21                zone and add more stalls               $          
 
22                                             TOTAL   $       
 
23     11.   MA'EMA'E ELEMENTARY SCHOOL
 
24           Drainage improvements on campus             $   600,000
 

 
Page 5                                                     
                                     H.B. NO.1650       
                                                        
                                                        

 
 1           Library to be built on the second floor 
 
 2                of the cafeteria                       $ 1,800,000
 
 3           Rock wall                                   $    10,000
 
 4                                             TOTAL   $ 2,410,000
 
 5     12.   NUUANU ELEMENTARY SCHOOL
 
 6           Design and construction of turn around      $   100,000
 
 7           Landscape play area                         $    50,000
 
 8           Electrical system upgrade                   $   175,000
 
 9           Security screen installation for buildings 
 
10                B, F, H, & I                           $   105,000
 
11                                             TOTAL   $   430,000
 
12     13.   CENTRAL MIDDLE SCHOOL
 
13           Replacement program for cafeteria
 
14                (preparation kitchen, student and
 
15                faculty dining room), classrooms,
 
16                auditorium, and library - design,
 
17                construction, equipment, and 
 
18                appurtenances                          $10,200,000
 
19           Replacement program for building A
 
20                Design                                 $ 5,300,000
 
21                                             TOTAL   $15,500,000
 
22     14.   DOLE MIDDLE SCHOOL             
 
23           Built-in lockers for students
 

 
Page 6                                                     
                                     H.B. NO.1650       
                                                        
                                                        

 
 1                Planning                               $     5,000
 
 2                Design                                 $    10,000
 
 3                Construction                           $    25,000
 
 4           Parking lot in back of school
 
 5                Construction                           $    35,000
 
 6           Construction and repairs for a building 
 
 7                separation and sinking of foundation
 
 8                Planning                               $    25,000
 
 9                Design                                 $    25,000
 
10                Construction                           $   250,000
 
11                                             TOTAL   $   375,000
 
12     15.   KALAKAUA MIDDLE SCHOOL         
 
13           Design and construction of multi-purpose
 
14                building/auditorium and park           $10,000,000
 
15                                             TOTAL   $10,000,000
 
16     16.   KAWANANAKOA MIDDLE SCHOOL      
 
17           Complete renovation/refurbishing of
 
18                interior of 35-year old music 
 
19                building that houses band and 
 
20                orchestra programs           
 
21                Design                                 $    37,000
 
22                Construction                           $   187,500
 
23           Redesign and resurface parking lot to
 
24                include speed bumps and painting
 
25                of stripes                                        
 

 
Page 7                                                     
                                     H.B. NO.1650       
                                                        
                                                        

 
 1                Design                                 $    37,000
 
 2                Construction                           $   187,500
 
 3           Build covered student lanai with tables,
 
 4                chairs, and security fence to 
 
 5                enclose entire lanai         
 
 6                Design                                 $    50,000
 
 7                Construction                           $   250,000
 
 8           Renovation of electrical lighting,
 
 9                plumbing system for auditorium
 
10                Design                                 $    40,000
 
11                Construction                           $   200,000
 
12           Replace underground plumbing
 
13                Design                                 $    25,000
 
14                Construction                           $   125,000
 
15                                             TOTAL   $11,390,000
 
16     17.   FARRINGTON HIGH SCHOOL
 
17           Renovate building I, rooms 101, 102,
 
18                103, 104, 201, 202, 301, 302, 
 
19                including additional lights, outlets,
 
20                new cabinets, painting, and flooring
 
21                Planning                               $    10,000
 
22                Design                                 $    20,000
 
23                Construction                           $   500,000
 

 
Page 8                                                     
                                     H.B. NO.1650       
                                                        
                                                        

 
 1           Widen school entrance to Kalihi Street
 
 2                by 10 feet to include 3 foot sidewalk
 
 3                on mauka side
 
 4                Planning                               $    15,000
 
 5                Design                                 $    40,000
 
 6                Construction                           $   200,000
 
 7           Resurface Vance Drive from gym to Kalihi
 
 8                Street, including parking areas by 
 
 9                shop, U bldg., and cafeteria
 
10                Planning                               $     5,000
 
11                Design                                 $    10,000
 
12                Construction                           $   230,000
 
13           Resurface track
 
14                Planning                               $     5,000
 
15                Design                                 $     5,000
 
16                Construction                           $   120,000
 
17                                             TOTAL   $11,600,000
 
18     18.   MCKINLEY HIGH SCHOOL           
 
19           Technology plan (electrical upgrade and
 
20                video accessibility)                   $   200,000
 
21           Replacement of boys P.E. lockers            $   200,000
 
22           Installation of 4 air conditioning units 
 
23                for building M                         $   200,000
 

 
Page 9                                                     
                                     H.B. NO.1650       
                                                        
                                                        

 
 1           Extending the cafeteria to accommodate 
 
 2                1,200 - 1,500 students                 $   750,000
 
 3           Removing and replacing all windows in 
 
 4                building W                             $ 5,000,000
 
 5           Resurfacing areas                           $    90,000
 
 6                                             TOTAL   $ 6,440,000
 
 7     19.   ROOSEVELT HIGH SCHOOL
 
 8           New multipurpose educational/athletic
 
 9                facility
 
10                Environmental assessment               $    25,000
 
11                Environmental hazards abatement plan   $     9,000
 
12                Planning/design                        $   870,000
 
13                Environmental hazards abatement/
 
14                  disposal (existing concrete 
 
15                  bleachers/showers)                   $    45,000
 
16                Demolition (bleachers/showers)         $    75,000
 
17                Site work (field & lights realignment) $ 1,500,000
 
18                Building construction                  $ 8,500,000
 
19                                             TOTAL   $11,024,000
 
20     20.   KALIHI VALLEY NATURE PARK/PRESERVE
 
21           Master plan and environmental impact
 
22                statement                              $   200,000
 
23                                             TOTAL   $   200,000
 

 
Page 10                                                    
                                     H.B. NO.1650       
                                                        
                                                        

 
 1      SECTION 2.  The appropriations made for capital improvement
 
 2 projects authorized in this Act shall not lapse at the end of the
 
 3 fiscal biennium for which the appropriation is made; provided
 
 4 that all appropriations which are unencumbered as of June 30,
 
 5 2002, shall lapse as of that date.
 
 6      SECTION 3.  The sum appropriated shall be expended by the
 
 7 department of accounting and general services for the purposes of
 
 8 this Act; provided that section 1, item 12 shall be expended by
 
 9 the department of land and natural resources.
 
10      SECTION 4.  This Act shall take effect on July 1, 1999.
 
11 
 
12                           INTRODUCED BY:  _______________________