Measure Title: RELATING TO RENEWABLE ENERGY.
Report Title: PUC; Renewable Energy; Grid-Ready Homes Interconnection Process; Hawaii Electricity Reliability Administrator; Report
Description: Requires the Public Utilities Commission to establish a streamlined grid-ready homes interconnection process. Expands reporting requirements of the Hawaii Electricity Reliability Administrator to include reporting on the grid-ready home interconnection process. Effective 7/1/3000. (HD1)
Companion:  SB2033
Package: None
Current Referral: EEP, CPC
Introducer(s): LOWEN, CHUN, EVSLIN, GRANDINETTI, KAHALOA, KAPELA, KEOHOKAPU-LEE LOY, LA CHICA, MARTEN, OLDS, PERRUSO, TEMPLO
Act:

Measure Status History

Sort by Date
DateChamberStatus Text
2/18/2026HPassed Second Reading as amended in HD 1 and referred to the committee(s) on CPC with none voting aye with reservations; none voting no (0) and none excused (0).
2/18/2026HReported from EEP (Stand. Com. Rep. No. 390-26) as amended in HD 1, recommending passage on Second Reading and referral to CPC.
2/12/2026HThe committee on EEP recommend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 7 Ayes: Representative(s) Lowen, Perruso, Chun, Kahaloa, Kusch, Quinlan, Matsumoto; Ayes with reservations: none; Noes: none; and Excused: none.
2/6/2026HBill scheduled to be heard by EEP on Thursday, 02-12-26 9:45AM in House conference room 325 VIA VIDEOCONFERENCE.
1/30/2026HReferred to EEP, CPC, referral sheet 5
1/28/2026HIntroduced and Pass First Reading.
1/26/2026HPending introduction.

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


All Versions of this Measure

Committee Reports

Hearing Notices

EEP
2/12/26 9:45A
325 VIA VIDEOCONFERENCE