Measure Title: RELATING TO THE PUBLIC UTILITIES COMMISSION.
Report Title: PUC; System Resilience; Hawaii Electricity Reliability Surcharge
Description: Establishes system resilience as a metric to be monitored and considered by the Public Utilities Commission. Provides that the Hawaii electricity reliability surcharge may be transferred to the Commission for the purpose of its duties. Effective 7/1/3000. (HD1)
Companion:  SB2505
Package: None
Current Referral: EEP, CPC, FIN
Introducer(s): COCHRAN
Act:

Sort by Date Status Text
2/8/2024HPassed Second Reading as amended in HD 1 and referred to the committee(s) on CPC with none voting aye with reservations; none voting no (0) and Representative(s) Nakashima, Nishimoto, Sayama, Ward excused (4).
2/8/2024HReported from EEP (Stand. Com. Rep. No. 165-24) as amended in HD 1, recommending passage on Second Reading and referral to CPC.
2/6/2024HThe committee on EEP recommend that the measure be PASSED, WITH AMENDMENTS. The votes were as follows: 6 Ayes: Representative(s) Lowen, Cochran, Gates, Kahaloa, Perruso, Woodson; Ayes with reservations: none; Noes: none; and 1 Excused: Representative(s) Ward.
1/31/2024HBill scheduled to be heard by EEP on Tuesday, 02-06-24 10:00AM in House conference room 325 VIA VIDEOCONFERENCE.
1/30/2024HRe-referred to EEP, CPC, FIN, referral sheet 6
1/26/2024HReferred to CPC, FIN, referral sheet 3
1/24/2024HIntroduced and Pass First Reading.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


HB2770 HD1
All Versions of this Measure
Committee Reports
Hearing Notices
EEP
2/06/24 10:00A
325 VIA VIDEOCONFERENCE