Measure Title: RELATING TO ELECTRIC UTILITIES.
Report Title: PUC; Electric Utilities; Wildfire Protection Plan; Civil Penalties
Description: Requires the Public Utilities Commission to convene workshops to aid electric utilities in the development and implementation of best practices regarding wildfires. Requires electric utilities to design and operate in compliance with a risk-based wildfire protection plan. Establishes a civil penalty for violations. Requires public utilities to report wildfires caused by or occurring in connection with their operations. Requires the Public Utilities Commission to investigate certain wildfires. Prohibits the reports as admissible evidence in any judicial, administrative, or other governmental proceeding.
Companion:
Package: None
Current Referral: EEP/WAL, CPC, JHA
Introducer(s): LOWEN, COCHRAN, HOLT, MARTEN, MATAYOSHI, MORIKAWA, NAKAMURA, NISHIMOTO, PERRUSO, QUINLAN, SAIKI, SAYAMA, TAM, TARNAS, TODD, WOODSON
Act:

Sort by Date Status Text
1/29/2024HRe-referred to EEP/WAL, CPC, JHA, referral sheet 5
1/24/2024HReferred to WAL/CPC, JHA, referral sheet 2
1/22/2024HIntroduced and Pass First Reading.
1/19/2024HPending introduction.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


HB2102
All Versions of this Measure
Committee Reports
No other committee reports available at this time. You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
Testimony
No testimony available at this time.
Hearing Notices
No hearings scheduled