RELATING TO ELECTRIC UTILITIES.
|
Report Title: |
PUC; Electric Utilities; Wildfire Protection Plan; Civil Penalties
|
Description: |
Requires the Public Utilities Commission to convene workshops to aid electric utilities in the development and implementation of best practices regarding wildfires. Requires electric utilities to design and operate in compliance with a risk-based wildfire protection plan. Establishes a civil penalty for violations. Requires public utilities to report wildfires caused by or occurring in connection with their operations. Requires the Public Utilities Commission to investigate certain wildfires. Prohibits the reports as admissible evidence in any judicial, administrative, or other governmental proceeding.
|
Companion: |
|
Package: |
None
|
Current Referral: |
EEP/WAL, CPC, JHA
|
Introducer(s): |
LOWEN, COCHRAN, HOLT, MARTEN, MATAYOSHI, MORIKAWA, NAKAMURA, NISHIMOTO, PERRUSO, QUINLAN, SAIKI, SAYAMA, TAM, TARNAS, TODD, WOODSON
|
Act: |
|
Sort by Date | | Status Text |
1/29/2024 | H | Re-referred to EEP/WAL, CPC, JHA, referral sheet 5 |
1/24/2024 | H | Referred to WAL/CPC, JHA, referral sheet 2 |
1/22/2024 | H | Introduced and Pass First Reading. |
1/19/2024 | H | Pending introduction. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
HB2102